Quick contact info

Introducing a truly professional WordPress theme built to last! We developed Wilmër for all construction & architecture sites.

icon_widget_image Monday-Friday: 9am to 5pm; Satuday: 10ap to 2pm icon_widget_image 7300-7398 Colonial Rd, Brooklyn, NY 11209, USA icon_widget_image + (123) 1234-567-8900 + (123) 1234-567-8901 icon_widget_image [email protected] [email protected]

New Kelani Bridge Construction Project

New Kelani Bridge Construction Project

The New Kelani Bridge utilizes high-quality Japanese technology. The bridge adopts the first extradosed design in Sri Lanka (a bridge in which the main girders are supported by the main towers and diagonal members). The steel box girder is used for the construction of the elevated road so as to build falsework over existing road in a short period of time.
  • Client: Road Development Authority
  • Contractor: Package 1 Sierra + TODA JV Package 2 Sumitomo Mitsui Construction Co + Sanken Lanka JV
  • Sub Contractor: International Construction Consortium (Pvt) Ltd – Residential Tower Nawaloka Construction Company - Hotel T
  • Consultant: Oriental Consultant Ltd
  • Admixture Supplier: Millennium Concrete Technologies Private Limited
  • Admixtures: Hypercrete Plus M, Hypercrete
  • Grades : C40, C50
  • RMC Suppliers: Sanken RMX, San RMX, Nawaloka RMX Tokyo RMX, Insee RMX
  • Remarks: The bridge adopts the first extradosed design in Sri Lanka.
  • Location: Colombo

Project Info

Category:
Date: